MSW/Electricity by gasification & incineration

image-936351-man_and_tree-9bf31.jpg




1 MW coal gasification power plant requires 10 Tons of coal / day.

Since the caloric value of MSW Briquettes is about 3000 Kcal/Kg, therefore:

1 MW MSW gasification power plant needs about 20 Tons of MSW Briquettes / day.

We assume this 20 Tons of briquettes will be derived from around 35 or 45 Tons of MSW in the proposed site at small cities

SynGas produced in our system of gasification has the following composition:

CO- 40%,   H2- 30%,   CH4- 11%,   CO2-6 to 8%,  N2-8 to 10%

which has Caloric value of 1800 Kilo Calories /cubic meter.

The Caloric value of Natural Gas is more than twice of Syn-Gas.

Pictures of our gasification unit is below​​​​​​​​​​​​​​

For big Cities with MSW more than 700 Tons / Day using Incineration

The MSW / E process by incineration after drying and sorting the garbage.

This power plant is very similar to coal power plant

Click on the link for Introduction: https://youtu.be/xZiFnJa2pLw

Usually the Environmental Agencies in the US do not like burning garbage as a source of Energy.
But our environmentally friendly system, which processes the garbage and then burns that, has the blessing of the Environmentalists.
To see a letter dated 2005: Click Here

The 63 MW Reppie Plant, Picture below,  in Ethiopia is the first such a plant in Africa 

image-936344-image004-16790.jpg
image-936296-image005-9bf31.gif
image-936290-image007-9bf31.jpg